Combine at dusk

Combine at dusk

Thursday, June 25, 2015

MOE Court Bulletin: Brantford Biosolids Management Company fined $105,000 for Ontario Water Resources Act Violations

NEWS
Ministry of the Environment and Climate Change


Brantford Biosolids Management Company fined $105,000 for Ontario Water Resources Act Violations
April 2, 2015 9:00 A.M.

Simcoe - Biosolids management company Wessuc Inc. (Wessuc) was fined $105,000 for discharging sewage biosolids into a watercourse that may impair the quality of the water, contrary to the Ontario Water Resources Act (OWRA).

Wessuc is located in Brantford and operates throughout southern Ontario. The company is primarily involved with the land application of municipal biosolids.

On October 11, 2011, a Non-Agricultural Source Materials (NASM) Plan was approved by the Ministry of Agriculture and Food (OMAF), for the land application of sewage biosolids to a Simcoe farm property on Concession 12. On April 27, 2012, the MOECC received notification from Wessuc that the sewage biosolid application would occur at the site, in accordance with the NASM Plan, between April 28 and May 5, 2012.

On April 30, 2012 and on May 2, 2012, ministry staff conducted sewage biosolid field inspections. During the May 2, 2012 inspection, Ministry staff observed a discharge of a dark-coloured liquid from the field's drainage tile, which entered a stream heading south through a road culvert, and flowed downstream onto a property south of the roadway. An assessment of effluent samples determined that the application of liquid biosolids resulted in discharge of biosolids to an unnamed tributary of Black Creek which impaired the quality of water in the creek.

Wessuc responded to the incident and cleaned up the spilled material at the Simcoe farm property. A Provincial Officer's Order was issued by the ministry to Wessuc to prevent the reoccurance of a similar event during the application of sewage biosolids on tile drained fields in the future.

The company was fined $105,000 plus a victim fine surcharge of $26,250 and was given one year to pay the fine.

Members of the media: Kate Jordan
Communications Branch
(416) 314-6666
Contact information for the general public: 1-800-565-4923



Wednesday, June 24, 2015

Enbridge Gas Distribution loses appeal over cost to relocate pipelines

In August, 2014, I posted about a decision from the Ontario Superior Court involving Enbridge Gas Distribution Inc. ("EGDI") and Metrolinx.  Metrolinx was awarded $2.3 million that it had previously paid to EGDI for the relocation of 6 pipelines.  The Court ruled that it was EGDI that was responsible for the cost.

The Court of Appeal has now dismissed EGDI's appeal of the lower court decision.  EGDI raised two issues: 1) CN, the predecessor in title to Metrolink, had a contractual right to require EGDI to pay to relocate pipelines only on CN-owned lands, not municipal road allowances; and, 2) even if Metrolinx had those rights, they were not conveyed by CN to Metrolinx.

The Court of Appeal did not agree with EGDI's interpretation of the agreement, finding that the obligation to pay to relocate pipelines included relocation for the purposes of alteration in the railway property, facilities or operations.  Those purposes were not restricted to railway-owned lands.  The Court also ruled that CN did transfer to Metrolinx the right to require EGDI to remove its pipelines at EGDI's expense.

Read the decision at: Metrolinx v. Enbridge Gas Distribution Inc.

Monday, June 22, 2015

Better Farming: Pig Farmer acquitted in methane-fueled barn fire

Read Better Farming's story about the recent acquittal of a Huron County hog farmer on Occupational Health and Safety Act charges connected to a 2012 flash fire that injured the farmer and his employee.  The Court determined that the fire resulted from the ignition of a build-up of methane that had resulted from a barn design flaw.

Friday, June 12, 2015

OMB dismisses claim for injurious affection where no taking - on merits and on basis of limitation period

The Ontario Municipal Board ("OMB") recently dismissed an injurious claim by a car wash business that saw a significant drop in business after a local road was realigned.  The claimant alleged that the realignment of County Road 10 led to a significant drop in traffic passing by the car wash, resulting in a reduction in the number of vehicles using the wash.  The claim was for injurious affection in a situation where the statutory authority, the County of Simcoe, did not actually expropriate any of the car wash lands.

In a case of injurious affection where there is no taking, the claim must meet the following requirements:

1)   The damage must result from the action taken under statutory authority (the statutory rule);

2)   The action would give rise to liability but for that statutory authority (the actionable rule); and

3)   The damage must result from the construction and not the use of the work (the construction and not the use rule).

Here, the car wash business was unable to establish that the losses it alleged it had incurred were the result of the construction of the realigned road.  As the OMB explained:

"The Claimant has not been able to prove on the balance of probabilities that the losses it alleges it incurred were the result of the re-routing of County Road 10 and the Board finds that the decline in the number of car washes was on the balance of probability, more likely caused by other factors such as general economic decline resulting in reduced consumer spending.  Furthermore, regular users of HW 89 who had been customers of the car wash prior to the re-routing of County Road 10 would have been required to travel only a short additional distance on HW 89 to continue to use the car wash according to the evidence."

and,

"The Claimant must establish on the balance of probabilities that the re-routing of County Road 10 was the cause of its alleged losses and it has not done so in this case.  Revenues were up in the year following the re-routing and the evidence suggested that the later downturn may have been caused by weather related factors as well as the downturn in the automobile industry including the elimination of the third shift at the Honda plant in the period 2007- 2008. The Claimant has failed to establish any causal connection between the Respondent’s works and any loss it has alleged."

In the end, the OMB ruled that the claim related to the use of the realigned road and not the construction of the realigned road.  On that basis, the injurious affection claim would fail.

However, the actual basis for the dismissal of the claim was the expiry of the applicable limitation period.  Injurious affection claims are subject to a one-year limitation period under Section 22(1) of the Expropriations Act:

Subject to subsection (2), a claim for compensation for injurious affection shall be made by the person suffering the damage or loss in writing with particulars of the claim within one year after the damage was sustained or after it became known to the person, and, if not so made, the right to compensation is forever barred.

The evidence before the OMB showed that the actual construction of the realigned road was completed on or about December 27, 2006 and made official on January 23, 2007.  The OMB agreed with the County that if the Claimant had suffered business losses from the construction, it knew or ought to have known of those losses occurring on a monthly basis from January, 2007 to February, 2008 (its fiscal year end).  The OMB concluded:

"The claim for compensation ought to have been initiated not later than January, 2009, to comply with the Act as it is required to serve its claim within one year of when the loss is sustained.  It is not reasonable to delay a claim until after the full amount of the loss is calculated as is being advanced by the Claimant.  The Claimant is also required to act diligently to inform itself of any loss giving rise to a claim.  In this case while the losses ought to have been known at the latest by February 28, 2008, the claim was not served until July 31, 2009, some 30 months after the road was stopped up and closed and the claim was not filed with the Board until September 30, 2009.  Furthermore, no previous notice of the claim was given to the Respondent."

Read the decision at: Willies Car & Van Wash Limited v County of Simcoe.

Wednesday, June 10, 2015

Empty barn not enough to trigger MDS to prevent neighbours' severance

Landowners had applied to their municipality to sever a 0.84 acre parcel from their existing 30-acre lot.  County planning staff determined that the proposed severance complied with MDS requirements and that the County had no objection to the proposal.  However, a neighbour did object to the severance, suggesting that the new lot would breach MDS provisions because it would come too close to his 1860-era barn.  Although the barn was vacant, the neighbour was considering returning the barn to livestock use.  He asked that the proposed severed parcel be moved to a different location on the applicants' property.

The municipality went ahead and approved the severance, so the neighbour appealed to the Ontario Municipal Board ("OMB").  The only issue on the appeal was the application of MDS to the severance, and the OMB ruled that MDS did not apply.  Although the OMB took issue with some aspects of the municipality's methodology for considering required setbacks, the OMB concluded that the neighbour's barn did not correspond to the definition of a "livestock facility" within the governing Provincial documents.  MDS had no application in this case.

As the OMB noted:

The fundamental problem with this appeal, however, pertains to the barn itself, and whether it even constitutes a "livestock facility", as understood in the Provincial documents. The Board was not persuaded for the following reasons.
The Provincial documents are unequivocal: to qualify as a "livestock facility", it is not enough for a building to be "structurally sound"; it must also be "reasonably capable of housing livestock." The two criteria are not synonymous. Although the neighbour insisted that the structure would not actually fall over, he offered essentially no evidence it could meet any other expectations.
Indeed, the Board was not shown how the existing structure could be much more than a "shade shelter" (which is specifically excluded from consideration as a "livestock facility"). Although there was no "comprehensive building analysis", it did not take a comprehensive analysis to discern that the structure had no insulation, electricity, ventilation, stalls, hay storage, manure storage, or livestock equipment. It also had planks visibly missing from its siding in various places. None of the observations by the CBO were contradicted. The structure is a shell, and not even one that is impervious to the elements.
Whether or not the structure was considered appropriate for livestock by 1860 standards, the Province would not have published its detailed instructions for "determining when a barn is a livestock facility", if such a primitive structure could qualify. The Board is satisfied that if this structure were subjected to even the most elementary agricultural standards today, substantial remodeling would be essential.
That is where the neighbour encounters a second problem. The Guidelines specify that MDS II also applies to "remodeled livestock facilities.”
The CBO apparently concluded that no remodeling under MDS II would be feasible – not because the barn was too close to the proposed severed parcel, but rather because it was too close to Ms. [S]'s existing dwelling across the road. The Board heard no evidence to contradict that position.
Therefore, notwithstanding the eloquence of the [O] brothers and their expert, the Board was not shown how the barn could now trigger the MDS process – or that it ever could.
Read the decision at: O’Brien v Laronde.

Tuesday, June 9, 2015

BC Court rules neighbours liable in nuisance for "water problem" discharges

A recent BC Supreme Court decision begins: "It has been said that water is the driving force of all nature and as such it can be very destructive. ... It is a truism that water follows the path of least resistance and flows down a landscape to find the lowest point.  It has a tendency to descend and flow with great readiness.  These properties of water are abundantly clear in this case which involves a now protracted dispute between neighbours."

Neighbours A alleged that Neighbours R made changes to the R property that resulted in water damage to the A property.  Neighbours A sued in nuisance, negligence and trespass and sought general, aggravated and punitive damages, as well an injunction obligating Neighbours R to remedy the problems.

The most significant change to the R property was the installation of a tile drain (as part of a french drain) ending about 3 feet from the boundary between the A and R properties.  This tile redirected water from the R property to the A property.  Neighbours R also raised the grading of their property by a few feet, which put their property higher than the A property.  Previously, the R property had been lower than the A property at the boundary in question.  The increased water flows (including sludge) that resulted from these changes caused the damages to the A property alleged by the A neighbours.

As a threshold issue, the judge in this case examined the applicability of statutory limitation periods.  Justice Kerr ruled that the two-year limitation period did apply.  However, she also recognized that where there is continuing damage, a new cause of action arises each day (to some extent resetting the limitation period each day for any "fresh damages").  In this particular case, the effect of the limitation period was that Neighbours A could not recover for any damages sustained before November 25, 2007.  The french drain had been installed in 2001, but they did not commence their action until November, 2009.

Justice Kerr concluded that Neighbours R were liable to Neighbours A in nuisance.  Neighbours R had caused "a substantial and unreasonable interference" with their neighbours' use and enjoyment of the A property.  And Neighbours R were not saved by any riparian rights.  The evidence showed that the water problems resulted from groundwater rather than surface water and that the flow of water between the properties was not by way of a natural watercourse.  Neighbours R could not say that they were not causing a nuisance for having allowed surface water to flow naturally across their land to the A property.  Even if they were dealing with surface water, Justice Kerr found that the flow was the result of the significant changes made to the R property.

She awarded to Neighbours A the sum of $10,000 in non-pecuniary general damages for loss of use and enjoyment of the A property and the sum of $27,908.66 in pecuniary general damages for the cost of remediating the A property.

Read the decision at: Allison v. Radtke.